As if the old back was not shot enough...start with two full work days on the roof, move onto a morning of helping at a sawmill, winch a 400 pound wood stove up some stairs into a truck, and top it off with 6 hours in the Dodge. I was able to score some 24" cherry logs which are worth quite a bit and have them sawed up down the road. I slabbed up the big one for a dining room table and bar top for the house. It only cost me $35 and a back to do it so well worth the lumber. Maranda and I drove down to Waynesville, NC to pick up or new stove for the house. The guys asked right away if either of were engineers. It was quite a feat winching up 30 stairs on a homemade sled. All the effort was worth the score of a 1983 Fisher Grandma Bear 3 that looked like it had only been used 5 times in 25 years. I could not be more excited...and so is she. We hit Sam's on the way home because nothing hits the spot more on a long day than a 15 pound bag of M & M's.
11.08.2008
Back For Hire
As if the old back was not shot enough...start with two full work days on the roof, move onto a morning of helping at a sawmill, winch a 400 pound wood stove up some stairs into a truck, and top it off with 6 hours in the Dodge. I was able to score some 24" cherry logs which are worth quite a bit and have them sawed up down the road. I slabbed up the big one for a dining room table and bar top for the house. It only cost me $35 and a back to do it so well worth the lumber. Maranda and I drove down to Waynesville, NC to pick up or new stove for the house. The guys asked right away if either of were engineers. It was quite a feat winching up 30 stairs on a homemade sled. All the effort was worth the score of a 1983 Fisher Grandma Bear 3 that looked like it had only been used 5 times in 25 years. I could not be more excited...and so is she. We hit Sam's on the way home because nothing hits the spot more on a long day than a 15 pound bag of M & M's.
11.07.2008
One More Hat for the House
The house got one more new hat for the rack on Friday. Wade and I finished the demo on Thursday and started the framing. Jeff and Mike helped out most of the day Friday, and Maranda hung in there until the paper was on the roof. We got rid of the big windows in exchange for smaller more efficient ones and also added a hip to the roof system when we raised the pitch. This greatly added some much needed headroom in the future bath and laundry rooms.
11.03.2008
Last Footing
Hopefully, barring a natural disaster, I was able to finish my last footing today. The weather looks decent for a week so I decided to knock down
Subscribe to:
Posts (Atom)
