Well..it is snowing here and quite nasty. The first coat of poly is on the floor and
12.05.2009
Almost Ready for Furniture
Well..it is snowing here and quite nasty. The first coat of poly is on the floor and
12.01.2009
12.01.09
I can't believe how the months fly by. I was getting depressed about missing the mortgage rates at the end of the summer but I called today and they are lower now... so I have to kick it in gear for the next week or so to finish. Floor guys got the rough out done and the corners pulled so all they have to do is buff sand and put the sealer on in the morning. I went and got some rough sawed pine for the back porch ceiling because I was tired of looking at it and finally had time to finish it. I used more cedar from the old living room beam to trim the ceiling and some old pieces of Douglas Fir as well. At this point I am trying to use anything I have up to get rid of it. I was unseasonably warm today so I was able to get the first coat of paint on all the siding that hasn't been done yet...at least it looks like it is done...second coat to come. I got the outside of the back door 2nd coated with the red paint so it is done.
11.30.2009
I See Sparks
Nothing but flying dust and sparks today. The floor finishers ran into a few too many fasteners for their taste but are making good progress. They got most of the rough out done today and should be able to finish sand and apply sealer by the end of tomorrow. I painted outside for awhile until it started raining...not a good combination. I got pretty much all of the first coat done on the siding that was bare and the first coat on the backside of the back door. Should finish tomorrow and be ready for the punch list outside.
11.27.09
Thaksgiving has come and gone with so much to be thankful for. On Friday the ultimate paint squad was assembled for the last minute indoor touch ups...including the back door(Maranda's color), back splash, dining room, and all the little spackled spots that have accumulated for the last few months. Uncle Loren was here today and was a great help at troubleshooting quite a few last minute things as well. Dad scraped the driveway and unloaded the last of our possesions that were produced during their move last week. I got the area under the stairs covered temporarily until we put another heat and air system in...that will be a cold air return. The flooring guys will be here Monday and the inside will be about done after that.
11.25.2009
11.20.09
We are getting by with some unusually decent weather in November which has allowed for some progress outside. I got the hand rail finished on the deck as well as the staircase in front. The original stairs were not square to the house so at the bottom you can see the discrepancy...who is looking right? I also got the varnish work downstairs done which was a second coat on all the T & G as well as a few doors. I got the Cherry bar top planed and finished which really looks nice and sets off the kitchen well. I have a little touch up paint to do in the kitchen and it is done. Things are wrapping up nicely so far.
11.16.2009
11.15.09
Pecking away at more little projects but they are really aking this place feel good. I got the bathroom bright work all completed woth the help of a sunny day. The window was so small that it was easier to varnish if removed. I got the one access panel under the bar hinged and operating. I was able to put a catch magnet and knob to match the cabinetry. I also put on the last 5 door handles downstairs so every door functions properly now. After our day we had a little fire in the stove and the pups got their attention too.
11.10.2009
Four More Checks
I am checking off lots of little aggravating tasks that are keeping us from being finished inside. I got the last section of the stairway trimmed out leading into the wood stove area as well as around the chimney in the laundry room. I cold have done this months ago but as I always say...why do it now when I can take care of it in a few months. Kids...don't procrastinate! I got the closet repainted from the puppy birthing project and a spankin' set of shelves made. I painted them red for Maranda and used some more recycled ash flooring for the trim and border pieces. I had to use an old sign to cover teh upstairs water shut-off valves but you would never know once they get filled with junk. I got the varnish work done in the downstairs bath and made a set of shelves in the cubby out of leftover stair treads. . . they were left over because I screwed them up and had to tear them off. I knew I stored them for a year for some reason. It is starting to feel close now... we will keep plugging away.