I had to demo the wall between our old bedroom and the old kitchen in order to reframe the center load bearing wall. The section behind the bathroom door is where the microlam will catch to span the living room so it had to go. The bathroom door was the last interior door standing...oh well. I think this is about as raw as it will get, so if we can stand this we may survive. I does feel good to get rid of all the old rot and dirt that has been above us since we moved in. If you look closely you can see that I actually left an original stud.
4.12.2008
Business As Usual
I had to demo the wall between our old bedroom and the old kitchen in order to reframe the center load bearing wall. The section behind the bathroom door is where the microlam will catch to span the living room so it had to go. The bathroom door was the last interior door standing...oh well. I think this is about as raw as it will get, so if we can stand this we may survive. I does feel good to get rid of all the old rot and dirt that has been above us since we moved in. If you look closely you can see that I actually left an original stud.
4.06.2008
Inch By Inch
3.20.2008
I Need a Dump Trailer
3.18.2008
2nd Floor
2.23.2008
More Demo


We have spent the last two weeks tearing out the ceiling in the bedroom and part of the kitchen so I can get the upstairs floor started. I thought the house was cold before but once again the only barrier we had left to the wind was s shotty roof and a ceiling...we are down to the shotty roof now. Dad came by and helped tear out part of the kitchen. I had to be able to access the tops of the bearing walls to receive the floor joists and be able to fasten them securely. My goal is to be able to build the new floor overhead without tearing the roof off...that way we will have a platform when it is time to remove the roof...I am expecting backfire. The ends of the joists will be protruding out of the existing roof line but I will just cover them with a blue tarp...and as you may know blue tarp is an accepted roofing material in watauga county.
2.07.2008
Nail It
Finally go the hardwoods started back in the bedroom. I had the electrician stop by to give me some guidance on updating my service to 200 amp. It is nice to have some positive movement for
1.09.2008
Get in Gear
Aren't you glad this is not what you see looking into your kitchen. Maranda a
nd I spent Friday evening cleaning out the last bit of kitchen floor, conc
rete forms, and a trip to Lowe's for
some lumber. This is the first trip to buy building material since beginning the interior. Framing the Kitchen is business as usual...three floors to match up, three different heights, and I am out of PBR. LEVEL is not an option so I am attempting FLAT. It is a dream come true to get the last bit of rot out of the house, plastic down, and insulation in the floor. I will have some fun transitioning between floors but a small task considering what we just accomplished. Pete stopped by to evaluate progress.
some lumber. This is the first trip to buy building material since beginning the interior. Framing the Kitchen is business as usual...three floors to match up, three different heights, and I am out of PBR. LEVEL is not an option so I am attempting FLAT. It is a dream come true to get the last bit of rot out of the house, plastic down, and insulation in the floor. I will have some fun transitioning between floors but a small task considering what we just accomplished. Pete stopped by to evaluate progress.
Subscribe to:
Posts (Atom)
