11.10.2007

Stop the Breeze




Finished the form work under the front of the house and poured the concrete completing the run. I used treated 6x6 4' on center to shore up the original 8x10 wormy chestnut beam. I used treated 2x6 studs between the posts, insulated with R 19 batts and covered it with 3/4" treated plywood. I build a 3' x 3' access door and then sealed all the remaining cracks between the block and the framing with great stuff. This should hopefully seal off the wind seeing as how we have had a giant hole under the front of the house for a few weeks now. Temps are down in the 20's at night lately.

No comments: