5.01.2008
New New New
After a stylish pose from our old buddy Dan, it was time to do some more ripping to install the new floor joists in the living room. I had to run a quadruple microlam to support the floor system. It could have been worse but at least I will have a flat ceiling. This go around I wised up an cut out the whole roofing boards instead of just a slot for the joist. As you can see from the photo, 1/2 of the job is done.

Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment