8.21.2008

Absolute Power

Finally got all the ducks in order to get the underground power installed. I dug 4 ft down and the dirt was like dust...like dust until I cut through the water line for Clayton's house. Nothing a trip to David Millers couldn't fix. I had to trench 150 feet from the main power pole to the house lucky for me the John Deere was available otherwise I would average about 3 feet per day due to all the rocks. Blue Ridge brought the power line the next day so I should be able to cover it up tomorrow and get the ball rolling to get the lines moved off the house. I couldn't update this blog without a tribute photo of the best dogs in the world hanging out while dad is working.




No comments: