A new month and we are off and running. Took a little break for turkey day but got back into the swing of things bright and early. The plumbers finished the rough in at about 3:00 so that is ready for an inspection. I spent the day finishing the dining room and kitchen floors. I had to tear out the old 1x10 white pine sub-floor. I put down a good layer of plastic and insulated between the joists and replaced the pine with new sub-flooring. Alan from Northwestern Heating and Air came and roughed in the new ducts under the floor because I think we all have had enough of the tight crawlspace game. I got the cable lines run upstairs and after the electricians wire the back porch we should be able to call the inspector. Another couple inches of snow fell today...quite windy too.
12.01.2008
12.01.08
A new month and we are off and running. Took a little break for turkey day but got back into the swing of things bright and early. The plumbers finished the rough in at about 3:00 so that is ready for an inspection. I spent the day finishing the dining room and kitchen floors. I had to tear out the old 1x10 white pine sub-floor. I put down a good layer of plastic and insulated between the joists and replaced the pine with new sub-flooring. Alan from Northwestern Heating and Air came and roughed in the new ducts under the floor because I think we all have had enough of the tight crawlspace game. I got the cable lines run upstairs and after the electricians wire the back porch we should be able to call the inspector. Another couple inches of snow fell today...quite windy too.
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment