5.29.2008

Stairway To Heaven

I took a short break from the house to add a shed roof to the side of the shop. Hopefully I will get the tractor soon up here so I needed a place to put it. Dad had the metal saved and I had most of the other materials to make this project happen. On another note, I got the stairway done to the second floor. I was able to patch in the floor around it thus completing the second floor system and the rough stairs. I am only a couple weeks out from being ready to tear off the roof. Maranda is finally ready to see some new construction.

5.08.2008

Bling Bling

I have always wanted to say I had "Bling" so the best I can do for jewels is these shiny new joist hangars. I tore off the first chimney today so I could run the other side of joists on top of the wall. I am tiring from demolition but it is all worth it when the day concludes with some progress. I am ready to tackle the stairs now and soon will sheet the floor after that. Dad is coming tomorrow to help me put an addition on the shop. Just a mere lean-to but space for the tractor.

5.01.2008

New New New

After a stylish pose from our old buddy Dan, it was time to do some more ripping to install the new floor joists in the living room. I had to run a quadruple microlam to support the floor system. It could have been worse but at least I will have a flat ceiling. This go around I wised up an cut out the whole roofing boards instead of just a slot for the joist. As you can see from the photo, 1/2 of the job is done.

4.24.2008

Nothing Left


There is nothing left inside...

4.19.2008

The Light Is Faint...But Its There


The light at the end of the tunnel is faint...so it is becoming a chore to convince everyone else. The living room is finally gone no more heat and I can move on to finishing the second floor system. Wade, Mom , and Maranda helped with the demo and the cleanup which proved to be a major task. I have made 3 dump runs and still have more in order to get rid of all the trash and debris. Hopefully now we can move forward with new construction quicker.

4.12.2008

Business As Usual


I had to demo the wall between our old bedroom and the old kitchen in order to reframe the center load bearing wall. The section behind the bathroom door is where the microlam will catch to span the living room so it had to go. The bathroom door was the last interior door standing...oh well. I think this is about as raw as it will get, so if we can stand this we may survive. I does feel good to get rid of all the old rot and dirt that has been above us since we moved in. If you look closely you can see that I actually left an original stud.



4.06.2008

Inch By Inch

Finally got the kitchen moved again into its next "permanent" home. We tore out the ceiling, joists, and insulation above the old kitchen and over part of the new one. I had to support the roof so it would not collapse in order to get the new ceiling joists in. Cousin Todd came over last Saturday and we were able to get the new LVL headers, top plates, and new ceiling joists started. I had to tear out the front wall of our bedroom so now we sleep in the middle of everything. Needless to say I have a great wife.