7.02.2008
Special Delivery
6.10.2008
Santa Can Kiss Butt
5.29.2008
Stairway To Heaven
5.08.2008
Bling Bling
5.01.2008
New New New
After a stylish pose from our old buddy Dan, it was time to do some more ripping to install the new floor joists in the living room. I had to run a quadruple microlam to support the floor system. It could have been worse but at least I will have a flat ceiling. This go around I wised up an cut out the whole roofing boards instead of just a slot for the joist. As you can see from the photo, 1/2 of the job is done.

4.24.2008
4.19.2008
The Light Is Faint...But Its There
The light at the end of the tunnel is faint...so it is becoming a chore to convince everyone else. The living room is finally gone no more heat and I can move on to finishing the second floor system. Wade, Mom , and Maranda helped with the demo and the cleanup which proved to be a major task. I have made 3 dump runs and still have more in order to get rid of all the trash and debris. Hopefully now we can move forward with new construction quicker.
Subscribe to:
Posts (Atom)
